Stringing is the final stage that brings a transmission line to life. AMGR carries out conductor stringing work across 380KV and 525KV transmission lines, connecting towers end-to-end to complete the line for commissioning. Our stringing teams pull and tension conductors across completed tower structures in line with precise engineering tolerances, ensuring correct sag, tension, and clearance across every span. This final stage completes the construction sequence — from access road and foundation through assembly, erection, and now full electrical continuity along the line.
It is the process of pulling and tensioning conductors across erected towers to establish the electrical connection along the full length of the transmission line.
Stringing completes the transmission line after towers are erected, connecting them end-to-end and preparing the line for commissioning.
Yes, we have completed conductor stringing work on both 380KV and 525KV transmission line projects across Saudi Arabia.